MV Ibis Arrow Phase 2
Installation of the second phase with 6 Cargo modules was executed along side in São Sebastião, Brazil...
Read more 
|
| |
|
|
|
|
MV Ibis Arrow
Installation of 4 Cargo modules was executed along side in São Sebastião, Brazil...
Read more 
|
| |
|
|
|
|
MV Harefield installation
Installation of 6 Cargo modules was executed along side in Santos, Brazil...
Read more 
|
| |
|
|
|
|
MV Cormorant Arrow installation
Re-installation of 2 Cargo modules from one ship to another, this work was executed along side Brazil...
Read more 
|
| |
|
|
|
|
MV Toki Arrow installation
Refitting and installation of 12 Cargo modules in Antwerp...
Read more 
|
| |
|
|
|
|
Drumfiller Australia
Trilobes has delivered a drum filling line as part of the extension of the Australia juice terminal in Newcastle...
Read more 
|
| |
|
|
|
|
Bio Energy Plant
Recently Trilobes delivered the first Liquid Biomass Co-Generation plant of 6 MW (and 7 MW thermal) in the Netherlands...
Read more 
|
| |
|
|
|
|
Self cleaning filter
Trilobes has designed, delivered and installed a self-cleaning filter unit for cleaning juices inline upto 1.5 mm with 40 Mtons/h capacity...
Read more 
|
| |
|
|